Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Al-Sobiei, O S, Arditi, D and Polat, G (2005) Managing Owner’s Risk of Contractor Default. Journal of Construction Engineering and Management, 131(09), 973–8.

Gambatese, J A, Behm, M and Hinze, J W (2005) Viability of Designing for Construction Worker Safety. Journal of Construction Engineering and Management, 131(09), 1029–36.

Goodrum, P M and Dai, J (2005) Differences in Occupational Injuries, Illnesses, and Fatalities among Hispanic and Non-Hispanic Construction Workers. Journal of Construction Engineering and Management, 131(09), 1021–8.

Harper, D G and Bernold, L E (2005) Success of Supplier Alliances for Capital Projects. Journal of Construction Engineering and Management, 131(09), 979–85.

Jiang, G and Shi, J (2005) Exact Algorithm for Solving Project Scheduling Problems under Multiple Resource Constraints. Journal of Construction Engineering and Management, 131(09), 986–92.

Kilian, J J and Gibson, G E (2005) Construction Litigation for the U.S. Naval Facilities Engineering Command, 1982–2002. Journal of Construction Engineering and Management, 131(09), 945–52.

Mohamed, Y and AbouRizk, S (2005) Technical Knowledge Consolidation using Theory of Inventive Problem Solving. Journal of Construction Engineering and Management, 131(09), 993–1001.

O’Connor, J T and Huh, Y (2005) Crew Production Rates for Contract Time Estimation: Bent Footing, Column, and Cap of Highway Bridges. Journal of Construction Engineering and Management, 131(09), 1013–20.

Riley, D R, Diller, B E and Kerr, D (2005) Effects of Delivery Systems on Change Order Size and Frequency in Mechanical Construction. Journal of Construction Engineering and Management, 131(09), 953–62.

Wibowo, A and Kochendörfer, B (2005) Financial Risk Analysis of Project Finance in Indonesian Toll Roads. Journal of Construction Engineering and Management, 131(09), 963–72.

Yang, I (2005) Chance-Constrained Time–Cost Tradeoff Analysis Considering Funding Variability. Journal of Construction Engineering and Management, 131(09), 1002–12.